Situation:

• It is normal in Malaysia to find concrete substrates badly leveled with numerous cracks and a very porous surface.
• The pump which the contractor provided was insufficient for the scope of the job. The short notifications caused ARDEX Singapore to rush both production and delivery
• Often damage to the CL 11 by other trades was found, as much as 5 mm deep in areas of 50 to 100 m².

Challenges:

• Large scale of work with many trades working at the same time
• As little as one-week notice for next installation
• Multiple installations PANDOMO 4000 m², 80,000 m² Rubber Floor underlayment, Customs area, boarding area‘s walkway, bridge – Sector 1,3,4,5,6,7,8
• Complex two-year construction schedule

Used Products

PANDOMO ATS

Unbonded screed – 50 to 75 mm thick

PANDOMO Terrazzo Micro Black

Finished Layer - 10 to 12 mm thick

ARDEX CL11

Commercial Leveling & Smoothing Compound

ARDEX FEATHER FINISH

Self-Drying, Cement-Based Finish Underlayment​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​

ARDEX P51

Primer

Please choose your region to see product offering in your Country
ARDEX GLOBAL

Solution:

ARDEX P51 was recommended to ensure minimize air bubbles and seal porous surface. ARDEX CL11 was installed, allowing rubber floor underlayment material to be placed in just one to two days compared to three to five days required for local self-leveling material.

ARDEX Feather Finish was used to patch up damage caused by other trades. Combined with the speed of ARDEX C 11, these products significantly reduced installation time.

ARDEX ATS unbonded screed was used for levelling the subfloor without directly contacting the concrete surface, reducing costs and time required for proper subfloor preparation.

ARDEX Singapore worked closely with the applicator and successfully ensured on-time delivery as well as consistent quality products during the installation period. As many as 50 men completed the entire job in only five months.

Participants:

Installer: DESIGNER FINISH (Malaysia) SDN BHD

General Contractor: DESIGNER FINISH (Malaysia) SDN BHD

Interior Design: HL DESIGN GROUP

Other Projects

Widex A/S Headquarters

Nike Yas Mall Abu Dhabi

PARKROYAL

Noosa Springs Day Spa & Fitness Centre

Old Synagogue

Oracle Broadbeach Apartments Gold Coast

New Secondary School Bochum

New Town Hall Grosskrotzenburg

Mall of Sofia in Bulgaria

Louis Vuitton boutique

Ministry of Food

New Doha International Airport